Overview

This project involves a comprehensive A/V upgrade for Coggin Avenue Baptist Church, including a new online production room, acoustic treatment, & video streaming enhancements. A key feature is the installation of an Absen PL2.9 LITE V10 video wall with 2.97mm resolution, along with upgraded audio infrastructure to DANTE & SDI over Fiber video routing. Additionally, the project includes adding congregation-facing microphones for better live stream audio and providing an iPad Pro for wireless audio mixing.

Audio
Video
Cabling

Project Details

Project Details

Limitations

  1. The Church had a myriad of desired upgrades completed in different phases by different vendors.
  2. They had a limited budget for a whole AV overhaul on their space.

The Solution

We were asked to partner with them in order to help them prioritize their needs, create a design, and deliver a cost-efficient, turn-key solution. After getting to know the church, the current style of worship, and the direction their ministry desired to go, we developed a phased approach. The first phase prioritized the audio and video side of their needs. Phase two will include the lighting, main PA upgrade, Q-SYS room control, Wireless and network upgrades.

Achievements

  1. Installed a high-resolution LED wall as the main display and upgraded the entire video streaming system, cameras, and control, ensuring high-quality broadcasts with SDI over fiber routing.
  2. Built a full A/V control room dedicated to online production, including a new mixer and acoustic treatment for improved sound quality in the online studio.
  3. Expanded and upgraded the PA system with under-balcony delay fills, sub bunkers equipped with subwoofers, and additional speakers for optimal sound coverage.
  4. Upgraded the Front of House audio console and converted all audio infrastructure and stage I/O to digital (DANTE), improving sound control, reliability, and signal clarity.
  5. Installed personal in-ear monitor (IEM) mixers for performers and enhanced stage audio with new wedge monitors and power sequencers, integrated into the digital signal processing system.

Gallery

Testimonial

"Our church had not done a significant media upgrade for almost twenty years and it was past time. FM did a top to bottom evaluation for our needs, came up with the best proposal for meeting those needs, and went over the top to answer every question we had. We liked them so much, we’re hoping to use them in the near future for another significant project. I would recommend them highly!"